Old Kiln Road, Flackwell Heath, Buckinghamshire

04 September – 12 September

Roadworks, Delays possible

Traffic management: Traffic control (give & take)

Description: new connection – excavate approx 30m in F/W 1 x joint bay in F/W for breech joint – expose the POC (cable that runs left to a pot end) – install

Works location: opposite no 9 OLD KILN ROAD

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP555S30000792

Sedgmoor Road, Flackwell Heath, Buckinghamshire

04 September – 06 September

Roadworks, Delays possible

Traffic management: Traffic control (give & take)

Description: excavation works to rectify LA defects

Works location: Junction of Chapel Lane to Junction of Chapman Lane, Both Sides

Responsibility for works: Swish Fibre

Current status: Planned work about to start

Works reference: C6008FLA-MMB-11

Swains Lane, Flackwell Heath, Buckinghamshire

04 September – 07 September

Roadworks, Delays possible

Traffic management: Traffic control (two-way signals)

Description: HH, Plot 1, 1x25mm MDPE Supply

Works location: 18 Swains Lane High Wycombe HP10 9BU

Responsibility for works: Thames Water

Current status: Planned work about to start

Works reference: MU09281217246H

  • Post published:05/09/2023
  • Post category:News